Insights. Follow our progress and successes.
What does a C-sink manager do?
Experts from a wide range of disciplines work at Openly. Reason enough to bring our colleagues in front of the curtain at irregular intervals and introduce their areas of work. This time, we put a few questions to Dr. Christoph Neururer, who heads up the "C-sink certification" department at Openly.
Revolutionary prefabricated wet rooms with heat recovery
Timber construction in particular is setting new standards in terms of construction speed. At the same time, fewer and fewer skilled workers are available. These two factors have inspired us to develop a prefabricated wet room with heat recovery together with Vorfaplast.
Zurich's pioneering work in CO₂ separation at Werdhölzli: a 178 million investment in our future
Major re-use project by OPENLY with Eberhard
OPENLY project in Widnau builds on 10 tons of reused steel beams.
Circular economy: There is great potential for reducing emissions in the reuse of steel components. Due to the high degree of standardization, this opportunity to save grey energy should definitely be exploited from a climate protection perspective. The reuse of steel beams is still in its infancy in practice.
International attention / Current pictures of the construction site
Swiss virtues come into their own at OPENLY: Engineering & craftsmanship
Primary goal: avoidance of CO2 emissions
A concrete list of "do without" and "focus on" in architecture.
OPENLY sees buildings as CO2 reservoirs.